Skip to Content (Press Enter)

DYC HVAC Info and SOP
5 Nov 2019

The previous DYC plan was to keep the pipes from freezing and the 2nd deck at a temp that did not take too long to change to a usable temp.

The current plan is to keep the spaces suitable for use at any time. This was precipitated by the need to air condition the locker room such that the ice machine could function. The actual numbers may change as we gain experience.

There are 5 separate rooms all handled by separate units:

LOCKER ROOM HVAC

Summer

Get remote kept in safe and proceed to locker room:

Winter

Get remote kept in safe and proceed to locker room:

Maintenance

Have unit serviced in spring when ice machine is serviced.

2nd DECK HVAC

Summer

Winter

Maintenance

Clean air filter behind front grill as ​needed, check after BOG meetings.